The area is also surrounded by a number of archeological sites, including an ancient amphitheater constructed around the fourth century BC, and the Bodrum Castle, which was constructed in the 15th century.
CastleRock is thus shaped by the forces that surround it, and attempts to blend harmoniously with the neighboring environment and respond sensitively to the nature slope.
As a strategy, the buildings are organized by bending and curving them along the natural contours of the site, thus sculpting the landscape and maximizing unobstructed views of the castle. This process is similar to that of braiding, where an organizational grid is established on the site, and a process of threading is used to organize the structures on the site.
As a result, housing types evolve thru a similar strategy, and are organized on different levels to provide a maximum level of variety. There are 16 units on the site consisting of 3 unique typologies. There are both duplex & triplex units, each with their own pool and garden. While sweeping walls provide a level of privacy for the units and maximize views from the houses, openings are punched in the stone walls in order to take advantage of the panoramic views at many different angles.
CastleRock makes use of very few materials, in order to respond more sensitively to the local environment and to provide a sense of unity with the natural surroundings. The buildings are constructed from four primary materials: stone, concrete, glass and steel.* The natural stone cladding is regional, and is supplied from local quarries.
Project: CastleRock
Author: Gökhan Avcioglu-GAD* + Dara Kirmizitoprak-DK
Design Team: Baris Ucar, Bruno Stringheta, Yeliz Özsoy, Müge Tan, Arzu Meyvaci
Location: Bodrum, Turkey
Client: Monarch Court
Construction date: 2009
Total Construction Area: 3854,41 m2
Project Manager: Oguz Develi
Photo Credit: Ozlem Avcioglu, Melis Eyuboglu
Author: Gökhan Avcioglu-GAD* + Dara Kirmizitoprak-DK
Design Team: Baris Ucar, Bruno Stringheta, Yeliz Özsoy, Müge Tan, Arzu Meyvaci
Location: Bodrum, Turkey
Client: Monarch Court
Construction date: 2009
Total Construction Area: 3854,41 m2
Project Manager: Oguz Develi
Photo Credit: Ozlem Avcioglu, Melis Eyuboglu